The OEE formula
OEE = Availability × Performance × Quality. Convert each factor to a decimal before multiplying. For example, 90% × 95% × 98% = 83.8% OEE (rounded to one decimal place).
1. Availability
Availability = Run Time ÷ Planned Production Time. Run time is planned production time minus downtime included in the selected measurement method. Define planned stops consistently before comparing shifts.
2. Performance
Performance = (Ideal Cycle Time × Total Units) ÷ Run Time. Convert time units so the numerator and denominator use the same unit. This page accepts ideal cycle time in seconds per unit and run time in minutes.
3. Quality
Quality = Good Units ÷ Total Units. Use a consistent rule for accepted units, rejects and rework. Do not count the same units in more than one category.
Interpreting an OEE result
An OEE result is only as comparable as its definitions and source data. Record the time window, included downtime, ideal cycle-time source, product mix and good-count rule. A performance result above 100% can signal that cycle-time assumptions or units need review; this calculator shows the result without capping it.
Want an Excel copy for shift reporting?
Download the blank workbook with an OEE calculator sheet and a daily production report format.
Get the free Excel templateNeed to categorize stoppages? Download the downtime log and Pareto template.
To see how production monitoring can connect machine status, output and downtime records, book a Micraft MES demo.